五月天丁香婷婷深爱,国产无遮挡18禁无码免费,精品一期二期无码,99精品视频免费热播在线观看,韩国一区二区无码精品,一区二区三区色欲AV性爱,免费大片一级a一级久久

首頁 > 新聞資訊 > 產(chǎn)品資訊 > 哈里伯頓推出新型高速遙測服務

哈里伯頓推出新型高速遙測服務

發(fā)布日期:2018-01-19 來源:linda 瀏覽次數(shù):
導讀:哈里伯頓業(yè)務部門Sperry Drilling宣布,推出JetPulse高速遙測服務,該服務可提供鉆井和地層評估測量的連貫高數(shù)據(jù)速率傳輸。

 

66.jpg

 

哈里伯頓業(yè)務部門Sperry Drilling宣布,推出JetPulse高速遙測服務,該服務可提供鉆井和地層評估測量的連貫高數(shù)據(jù)速率傳輸。這個新遙測系統(tǒng)可以幫助作業(yè)者做出更快的決策,優(yōu)化井位,改善井控,同時提高鉆井效率。

JetPulse服務能夠在廣泛的深度范圍和復雜的井眼軌跡中連續(xù)傳輸井下數(shù)據(jù),物理數(shù)據(jù)速率高達每秒18位。它可為任何高速遙測系統(tǒng)提供高井漏(LCM)偏差,幫助操作員泵出所需的LCM濃度,從而在不改變或堵塞井底組件的情況下避免泥漿損失。該系統(tǒng)還可縮短鉆井曲線的平穩(wěn)時間,通過結(jié)合新的遙測技術(shù)與隨鉆測量/隨鉆測井(M / LWD)服務,大限度地提高滲透率并優(yōu)化儲層接觸。這樣操作人員可以做出更早和更有效的決定,以便在單次運行中鉆探時間更長。

“在需要大量數(shù)據(jù)集合的環(huán)境中,如深水區(qū)和成熟油田,運營商依靠井下數(shù)據(jù)的準確性和時效性來作出關(guān)于油井的明智決策,并預計單道部分。” Sperry Drilling部門副總裁 Lomar Duhon表示。“JetPulse是高速遙測系統(tǒng)的下一個發(fā)展版本,能夠?qū)崿F(xiàn)準確的井位和減少鉆井時間,以大限度地提高客戶的資產(chǎn)價值。”

該服務還包括JetPack 3D井下數(shù)據(jù)管理功能,可將多個數(shù)據(jù)集合壓縮并安裝在一個程序包中,實現(xiàn)超過每秒140位的有效數(shù)據(jù)速率,使操作人員可以在鉆取時獲得正確的數(shù)據(jù),從而加強決策。

近有亞洲地區(qū)的運營商部署了JetPulse,主要原因是其目標儲層部分以上的地層壓力較高,生產(chǎn)區(qū)高度超標。操作人員需要頻繁更新隨鉆壓力(PWD)數(shù)據(jù),以快速調(diào)整鉆井參數(shù)和等效泥漿重量或等效循環(huán)密度,以避免不必要的壓裂和/或差異卡住。

JetPulse提供所需的壓力數(shù)據(jù),幫助操作員預測潛在的挑戰(zhàn),并在任何非生產(chǎn)性時間之前對動態(tài)鉆井環(huán)境做出反應。操作人員在預算范圍內(nèi)到達生產(chǎn)區(qū),不會破壞油井或允許不需要的地層流體進入。此外,JetPulse為該地區(qū)的運營商提供了快的泥漿脈沖傳輸速率。


關(guān)于鼎恒石油



 需要購買井下產(chǎn)品或需要了解產(chǎn)品詳細參數(shù)及相關(guān)疑問,可直接進入鼎恒石油官網(wǎng)咨詢網(wǎng)站客服或者撥打銷售熱線18000522697。 

 四川鼎恒石油機械設備有限公司(http://syjrw.com)是一家擁有進出口經(jīng)營權(quán),長期從事國內(nèi)外石油天然氣設備和配件的專業(yè)銷售公司。鼎恒石油公司總部設在四川成都,在加拿大大不列顛哥倫比亞省成立了分公司。我公司與多家世界知名制造廠商建立了緊密的合作關(guān)系。


注:該文章由鼎恒石油編譯,轉(zhuǎn)發(fā)須注明出處。


附英文原文:

Halliburton launches new high-speed telemetry service

HOUSTON -- Sperry Drilling, a Halliburton business, has announced the release of JetPulse high-speed telemetry service, which provides consistent, high-data rate transmission of drilling and formation evaluation measurements. This new telemetry system helps operators make faster decisions to optimize well placement and improve well control while increasing drilling efficiency.

The JetPulse service transmits downhole data consistently over wide depth ranges and complex well trajectories with physical data rates up to 18 bits-per-second. It provides the highest lost circulation material (LCM) tolerance of any high-speed telemetry system, helping the operator pump the required LCM concentration to cure mud losses without changing or plugging the bottom hole assembly. The system also reduces flat time on the drilling curve, maximizes rate of penetration and optimizes reservoir contact by combining new telemetry technology with measurement/logging-while-drilling (M/LWD) services. This allows operators to make earlier and effective decisions to drill long sections in a single run.

"In environments requiring large data sets such as deep water and mature fields, operators rely on the accuracy and speed of downhole data to make informed decisions about their wells and expect single-run sections," said Lamar Duhon, V.P. of Sperry Drilling. "JetPulse is the next evolution of high-speed telemetry systems that enable accurate well placement and reduced well time to maximize customers' asset value."

The service also includes JetPack 3D downhole data management, which compresses and configures multiple data sets in one package, giving effective data rates of more than 140 bits-per-second so operators can get the right data while drilling for enhanced decision-making.

An operator in Asia recently deployed JetPulse where there was high formation pressure in the zone above the targeted reservoir section and a high overbalance in the production zone. The operator needed frequent updates of pressure-while-drilling (PWD) data to quickly adjust drilling parameters and equivalent mud weight or equivalent circulating density to avoid unwanted fracturing and/or getting differentially stuck.

JetPulse provided the pressure data needed, helping the operator anticipate potential challenges and react to the dynamic drilling environment before any non-productive time could occur. The operator reached the production zone within budget and without fracturing the well or allowing the entry of unwanted formation fluid. In addition, JetPulse delivered the fastest mud pulse transmission rates for this operator in this region.

關(guān)鍵詞
下一篇:螺桿鉆具馬達
同類資訊
推薦產(chǎn)品

鼎恒石油 四大承諾

免費送貨

客戶只需支付產(chǎn)品價格,無需支付任何其他費用,如包裝費或運費,且不設置起定量。

質(zhì)量保證

鼎恒所有產(chǎn)品提供半年的質(zhì)量保證,鼎恒代理品牌可提供1年的質(zhì)量保證。

30天退換

假如某些產(chǎn)品不符合需求,在保證外包裝完整的前提下,鼎恒將安排退貨并且快速發(fā)貨。

正品保證

鼎恒所有提供的產(chǎn)品均擁有進品報送資料和原品證明,保證正品。

公司介紹  產(chǎn)品中心 產(chǎn)品詳解 聯(lián)系我們

四川鼎恒石油機械設備有限公司 備案號:蜀ICP備13028346號-1

聯(lián)系電話:18000522697  傳真:86-028-84339506

地址:成都市成華區(qū)雙成2路39號